Article Under Review
The Definitive Guide to shed
Anthony delivered the shed just shy of 6 weeks. It had been neat watching him off-load and go the shed using the remote control ‘mule’. Our bumpy terrain didn’t section him attending to the pad. He patiently maneuvered it so that the shed sits squarely on the pad. The very 1st Duramax built, the LB7 (2001-2004), appears to have by far the